The four statutory inspection phases

Understand the four phases every building passes through and how sign-off works.

Every project moves through four sequential statutory inspection phases: Pre-Construction, Setting-Out & Foundation, Structural/Floor (repeated per floor), and Final Evaluation. A phase cannot be signed off until the previous one has passed.

A failed critical checklist item automatically holds the phase and applies a stop-work order to the project.