Every project moves through four sequential statutory inspection phases: Pre-Construction, Setting-Out & Foundation, Structural/Floor (repeated per floor), and Final Evaluation. A phase cannot be signed off until the previous one has passed.
A failed critical checklist item automatically holds the phase and applies a stop-work order to the project.