An NCR records any finding that falls short of the required standard, linked to a project, inspection phase and checklist item. NCRs have a severity (minor, major, critical) and a lifecycle: open → corrective action → re-inspection → closed or waived. A critical NCR automatically holds the project.
Was this article helpful?